Description: 22 EDC G 2025 26 Name of Work 33 11 0 0 5 10 0 0 0
Details: 5 MVA & 10 MVA capacity T/F installed at different 33/11 KV Substations under the geographical area of EDD-II, GondaStopping of oil leakage by application steel putti composite of two components steel filled epoxy resing and hardener before applying this material for stopping oil leakage remove the degreasing and sludge removal from the transformer and also remove the paint over surface where oil leakage is to be stopped later tighening of competer nuts & bolts of the body and cleaning the complete transformer. 02 No. Radiator Flenge (L.T. Side) OLTC Top Cover OLTC Side Cover Inspection Cover Stopping oil leakage from Top Cover including nut & bolt
Sector: Distribution