Details: earthwork in excavation of foundation in ordinary soil (loam, clay & sand) including liftupto 1.50 m and lead upto 30 cm including filling, watering and raming of excavated earth into the trenches or in the plinth and removal and disposal of surplus earth as directed by the eng. including upto a distance of 30 mtr from foundation as per (s.l.no.251) construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at omc, and compacting with smooth wheel roller to achieve the desired density, complete as per technical specification clause 401. class 150 sub class 'a' brick work in 1:4 cement coarse sand mortor in foundation & up to plinth including supply of all materials and tools and plants etc. required for proper completion of the work . as per (s.l.no305) providing and laying of factory made 80 mm thick rubber moulded interlocking cement concrete tilles (30 mpa) incl
Sector: RDPR