Description: Work of Overhauling Calibration Testing Commissioning of Pyrometry Instruments SIEMENS make PLC control system along with Gate Valves Electrical Drives all Control and Instrumentation system of ASH HANDLING SYSTEM of Unit 13 2 X200 MW BTPS Name of Work Overhauling Calibration Testing Commissioning of Pyrometry Instruments SIEMENS make PLC control system along with Gate Valves Electrical Drives all Control and Instrumentation system of ASH HANDLING SYSTEM of Unit 13 2 X200 MW BTPS OBRA
Details: Complete Overhauling, Testing and Re-commissioning of K-type thermocouple of size 160 mm to 400 mm with termination of cable at both end with proper ferruling and dressing.(i) BFP 12 (A, B, C) working oil –03Nos.(ii) Ball Mills- 6 x 2 =12 Nos.(iii) Main steam temp (L/R) - 02 Nos.(iv) Boiler 13 M to 36 M – 22 Nos.(v) Boiler 42 to 48 M – 19 Nos.(i) Turbine -4 M to 9 M – 62 Nos. Complete Overhauling, testing and Re-commissioning of K-type thermocouple of size 1250 mm by providing protection pipe with by carrying out cutting and welding work with termination of cable at both end with proper ferruling & dressing.(i) Hot PA duct to mills -2X6 = 12Nos.(ii) PA temp at APH inlet/outlet (L/R)-06 Nos.(iii) Secondary air temp at APH inlet/outlet (L/R) = 08 Nos.(iv) Flue gas temp at APH (L/R) - 2X7 = 12 Nos.(i) Flue gas temp at ID 12 (A&B) outlet -02 Nos. Complete Overhauling, testing and Re-commissioning of S-type thermocouple of size 1000 mm by providing protection pipe with by carrying out
Sector: Generation