Details: scraping of internal section including bed, berm, and inner side with cutting filling up to 8 cm and disposal of refuse material as per direction of engineer-in-charge. videography/photography of silt clearance work in canal before work, during work and after silt clearance by drone as per required including supply of videogrphy /photography in pen drive and vehicles for movement as per direction of engineer in charge. supply and fixing of sign board
Sector: Irrigation