Details: mild steel (tor steel or plain) or iron in plain work such as reinforced concrete or reinforced brick work (when not included in an overall rates) wrought to required shape as necessary including bending for proper completion of the work and including supply of steel its wastage bend hooks and authorised overlapping shall be measured up to floor two level . (pwd s.i no- 504)/2022 g.f rcc work with cement approved coarse sand and 2cm (3/4")gauge approved stone ballast in the proportion 1:1½:3 (1 cement : 4½ aggregates) in raft foundation and footing excluding of reinforcement including its bending the same with 24 bwg binding wire and necessary centering & shuttering etc and also including supply of all material, labour, t&p etc. required for proper completion of work.(sor no item no.283a/2022 providing and fixing chlorinated polyvinyl chloride (cpvc) pipes, having thermal stability for hot & cold water supply, including all cpvc plain & brass threaded fillings and fixing the pipe
Sector: Urban Authority