Details: rectification of dc earth fault leakage at 220 k.v. sub- station, amethi under etd-sultanpur, with all due care of safety & precautions, with all cost of men, misc. consumables, t&ps etc. required for satisfactory completion of work as per technical specification & direction of the supervising engineer as detailed under :- identifying/tracing and removing of 110v dc leakage in control /protection cables of 220kv feeder, 132kv feeder, 33kv feeders,c&r panels, dcdb, battery charger, marshelling box of transformer alongwith cleaning and tightening of terminal blocks of feeders at 220kv s/s amethi work including all cost of men and t&p. separation of dc circuit of faulty control or protection cables of 220,132 & 33kv bays work including laying of new 2cx2.5 or 4cx2.5 (as per site requirement ) sqmm cable in cable trench from control and protection panel to its associated connected equipment and termination properly by using suitable size of cable gland , lug, ferrule including cost of lab
Sector: Transmission