Details: excavation in foundation in ordinary soil (loam,clay or sand ) including lift upto 1.50 m and lead upto 30m , including filling watering and ramming of excavated earth into the trenches and removal & disposal of surplus earth as directed by the engineer-in-charge up to the distance of 30.00m from the foundation trench ... complete item.(s.i.-251-a) cement concrete with 4cm gauge approved stone ballast, fine sand and cement in the proportion of 1:4:8 including supply of all material and labour, tools & plants etc. required for proper completion of the work. m-150 brick work 1:4 cement coarse sand mortar in foundation …. complete item c.c 1:2:4 as in plain work….complete item (s.i- 279a) 12 mm thick 1:4 cement coarse sand plaster … complete item s.i-584 new item construction of granular sub base by providing well graded material ,spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotovator at omc , and compacting with smooth wheel rol
Sector: Export promotion