Details: cluster civil of work earth work in exacavation for filter collection chember, recharge pit & pvc pipe line with laboure t&p etc p/l of p.c.c. in 1:4:8 in base with cement, fine sand & 40 mm brick ballast i/c all material & labour t&p etc. class m100 brick work in 1:4 with cement & coarse sand mortar in sub structure i/c all labour & material charges as per s i no.305 p/l of c.c. in 1:2:4 in floor with cement coarse sand & 20 mm stone grit i/c all labour & material charges 12 mm thick cement plaster in 1:4 with cement and coarse sand mortar i/c all labour & material charges p/l of r.c.c work in 1:2:4 in slab with cement coarse sand & 20 mm stone grit i/c all material & labour t&p etc (for chember & recharge pit cover) rainforcement work for r c c such as mild steel bar supply and fixing 110mm pvc fitting such t, elbow, socket solvent clump cost iron jali etc. first class brick on flat floor laying of 110mm pvc pipe for conduit drain work s/f of 110 mm dia pvc pipe 6 k.g.f/
Sector: Irrigation