Details: earthwork in filling/strengthening of damage bank and weaker section of canal in ordinary soil, excavation earthwork in embankment to be in 20cm layer including ramming and dressing the surface to required levels, slopes and also including lift upto 1.5m and lead upto 1.00 km with transported earth by manual labour and machine excluding gst. earthwork in foundation in dry ordinary soil including lift upto 1.5m and lead upto 30m including backfilling watering and ramming of excavated earth in to the structure and sides of foundation trenches with removal and disposal of surplus earth as directed by engineer in charge upto distance of 30m from the foundation trenches for other structure. providing concrete for plain concrete m 10 grade in foundations including cost of finishing and excluding reinforcement in 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 10-20 mm nominal size) mechanically mixed, placed in foundation and compacted by vibration including curing complete,
Sector: Irrigation