Details: overhauling of air release valve installed on cw discharge line and common header of unit #9 as per scope of work. primer and painting of cw, acw and sacw pump and their lines situated in their respective pump houses of unit #9 and all filters of sacw pump and acw pump. cleaning of cold water basins of cooling tower unit no.09 overhauling of acw pump of u#9 overhauling of sacw pump u#9 primer and painting of air receiver tank inspection and replacement of broken v bar etc. if any per cell fan of cooling tower of u#9 inspection and replacement of pvc pipes, damaged pvc pipes pipe & nozzles per cell fan of cooling tower of unit #9 overhauling of gear box of cooling tower of u#9 overhauling of drive shaft of cooling tower of u#9 overhauling of axial flow fan of cooling tower of u#9 overhauling of butterfly valves (600 mm) with gear box (both suction and discharge) overhauling of butterfly valves (450 mm) with gear box (both suction and discharge) overhauling of butterfly valves (300mm)
Sector: Generation