Details: earth work in embankment/silt clearence including lift upto 1.5 m. lead upto 30 m. ramming and dressing by hydraulic excavator/jcb/poclain machine as directed by the engineer-in-charge. uprooting sarpat moonj and jhunds from canals bank including its disposal as directed by the engineer-in-charge.
Sector: Irrigation