Details: following works are required for stoppage of oil leakage from 63mvar r phase unit of 189mvar bus reactor by replacemnt of old and damaged gasket including centrifuging work of reactor oil at 765kv s/s unnao,as per details given below- draining of bus reactor oil from main tank of bus reactor to empty 20kl. oil tank.all manpower ,material and t&p will be provided by firm for proper completion of work. providing of dry air plant at the time dismantling of 63mvar r phase main tank unit and filling of dry air of dew point -50°c or better for completion of work. the work shall including connecting pipe as required measuring due point values of dry air. complete dismantling of 63 mvar of all radiators, conservator tank, oil pipe line, all bushing turret,l.a.,all pipe line, radiator, and other associated work to complete the job satisfactory including proper stacking. all other t & p etc. shall be arranged by the contractor at his own cost. providing and replacement of old and damaged g
Sector: Transmission