Details: earthwork in felling in ordnary soil (loam clay or sand) including lift upto 1.5 m and lead upto 10 km and including filling watering and ramming of excavated earth in to the tranches or in to the space between the building and the sides of foundation trenches or into the plinth and removel and disposal of surpluse earth as directed by the enjineer-in-charge upto distance of 30m from the foundation trenches (i.s. 253 & 231a) concrete with 4 cm. gauge brick ballast, fine sand of 1.25 f.m. and cement, in proportion of 12:6:1 in foundation and under floors, including supply of all materials, labour, tools & plants etc, required for proper completion work as per si no. 273 m -150 brick work in foundation in 1:4 cement & c/sand mortar as per si no. 305a 12 cm thick plaster with cement and coarse sand in 1:4 over brick work minimum thickness not to be less than 1cm including supply of all materials, labour, tools & plants etc. required for proper completion of the work. as per si no. 584 (a)
Sector: RDPR