Details: cleaning thick bushes and thorny jungle without uprooting. e/w in cutting or in embankment in ordinary soil,excavation to be in the form of regular pits and earth work in embankment to be in 20 cm. layers, including ramming and dressing the surface to the required levels and slopes and also including 1.50m lift and 30m. lead the earth from cutting to be used in making embankment or to be deposited as spoil bank within 30m. distance as directed by eng. in charge. brick work in 1:4 cement & coarse sand for sleeper in c.c. lining with required excavation including cost of all material , labour t&p etc. for required for proper completion of work. preparation of sub grade and filling fine sand including cost of all material, labour, t&p etc. for required for proper completion of work. cement plaster 12mm thick in 1:4 with cement and coarse sand with floating coat of neat cement over plaster including all cost of material, labour, t&p. etc. complete. c.c. lining in c.c. 1:2:4 in cement,
Sector: Irrigation