Details: earth work in cutting or in embankment in ordinary soil. excavation to be done in the form of regular pits not exceeding 1/2 m. in depth and earth work in embankment to be done in 20cm. layers including its ramming and dressing the surface upto required level and and including 1.5m lift and 30m. lead. the earth from cutting to be used in making embankment or to be deposited as spoil banks within 30m. distance including t & p etc. as per direction of the e/i. (as per up pwd sl. no. 253). inc. mechanical compaction in layers by road roller. construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on preared surface, mixing by mix in place method with rotavator at omc, and compacting with smooth wheel roller to achive the desired denisty, complete as per technical specification clause 401. providing laying spreading and compacting stone aggregates (size 45-63mm) of water bound macadam specification including spreading in uni
Sector: RDPR