Details: construction of embankment with approved material obtained from availble land as permitted and approved by engineer-in-charge and as per technical specitaion clause 301.3.4.1, with all lifts and leads, spreading, grading to required and compacting to meet requirement of tables 300.1and 300.2 as per technical specification clause 301.5 construction of subgrade with approved material obtained from borrow pits with all lifts and leads. transporting to site, spreading, grading to required and compacted to meet requirement of table 300.2 with lead up to 1000 m as per technical specification cause 303.1. including stablization with 2% slaked lime including its mixing with rotabator complete. construction of granular sub base by providing well graded material, spreading in uniform layer with motor grader on prepared surface mixing by mix in place method with 2% cement (opc) with rotavator at omc and compacting with smooth wheel roller to achive the desired density complete as per cla
Sector: PWD