Details: excavation of earth with the help of suitable t&p and labour, watering and ramming of excavated earth. 0.2 meter concrete with 40mm brick/stone ballast coarse sand and cement in ratio of 1:4:8 in foundation under floor. including the supply of all material /labour and tools etc. required for completion of work satisfactory including the cost of cement first class brick work for construction of retaining wall in 1:4 mix ratio, cement and sand including the cost of all material, labour and t&p etc. required for completion of work. 0.1-meter-thick concrete in plinth with 20mm stone ballast, coarse sand cement mortar in ratio of 1:2:4 on the top platform of the foundation including all material,labour and t&p etc. required for proper completion of work. 12mm thick plaster work on wall (outer surface) with cement and sand in ratio 1:4 including cost of all material, labour and t&p required for proper completion of work. earth filling under in area revetment of the towers including the cost
Sector: Transmission