Details: deep bore tube well 02 nos boring/drilling bor well of required dia for casing/strainer pipe, by suitable method presribed in is: 2800 (part i) incluidng collecting samples from different strata, preparing and submitting strata chart/bore log including hire & running charges of all rquipments, tools plants & machineries required for the job, all complete as per direction of engineer-in-charge, up to 90 mtr depth below gound level 400mm dia boring/drilling bor well of required dia for casing/strainer pipe, by suitable method presribed in is: 2800 (part i) incluidng collecting samples from different strata, preparing and submitting strata chart/bore log including hire & running charges of all rquipments, tools plants & machineries required for the job, all complete as per direction of engineer-in-charge, beyond 90 mtr & up to 150 mtr depth below gound level 400mm dia supplying , assembling, lowering and fixing in vertical position in bore well, erw (electir resistance welded) fe-410 mi
Sector: Infrastructure