Details: excavation in foundation in ordinary soil (loam, clay or sand) including, lift up to 1.50 m and lead up to 30m and including filling watering and ramming of oxcavated the building and the sides of foundation trenches or into the plinth and removal and disposal of surplus earth as directed by the engineer-in-charge up to a distance of 30m form the foundation trenches. (rate including royalty of earth also) (4-chapter s.i.no4.01) providing and laying cement concrete in l :5:10 ( cement : 5 coarse sand : 10 graded stone aggregate40 mm nominal size) and curing complete, lncludingcost of form work. in foundation and floors. rcc work providing and laying in position specified grade of in rcc raft foundation,including the cost of centering, shuttering, finishing and excluding reinforcement- all work up to plinth level; 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 40 mm nominal size) (s.i. no. 5.1.3 reinforced cement concrete work in walls (anythickness), including attachedpilast
Sector: RDPR