Details: clearing jungle including uprooting of rank vegetation, grass brush wood, trees and saplings of grith up to 30cm measured at a height of 1m above ground level and removal of up to a distance of 50m outside the periphery of the area cleared. providing and applying 2.5 mm thick road marking strips (retro- reflective) of specified shade/ colour using hot thermoplastic material by fully/ semi automatic thermoplastic paint applicator machine fitted with profile shoe, glass beads dispenser, propane tank heater and profile shoe heater, driven by experienced operator on road surface including cost of material, labour, t&p, cleaning the road surface of all dirt, seals, oil, grease and foreign material etc. complete as per direction of engineer-in-charge and accordance with applicable specifications. first class brick work in 1:4 cement and coarse sand of 1.25 f.m. mortar in foundation and plinth including supply of all meterials, labour and t&p etc. required for proper completion of the work
Sector: Industry Development