Details: conservation work of dimroni ki garhi at jhansi (u.p.) conservation work excavation of earth in ordinary soil (loam clay or sand) including lift upto 1.50 meter and lead upto 30 meter and including filling, watering and ramming of excavated earth into the trenches or into the space between the building and sides of foundation trenches or into the plinth and removal and disposal of sur-plus earth as directed by the engineer incharge up to a distance of 30 meters from the foundation trenches. filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 and for all lift. cutting and removal of rank vegetation, grass & thick bushes very very carefully to avoid any damage to the heritage structure using pick axes, swords, crow bars, darati & khurpa etc. wherever necessary and disposal of
Sector: Infrastructure