Details: apex road/drain excavation in foundation in black cotton soil (in bundelkhand area) including lift upto 1.5 m. and lead upto 30 m. and including filling, watering and ramming of excavated earth into the trenches or into the space between the building and the sides of foundation trenches or into the plinth and removal and disposal of surplus earth as directed by engineer-in-charge a distance of 30 m. from the foundation (drain/edging).251 earthwork in cutting or filling in ordinarry soil excavation to be in the form of regularpits not exeeding 1/2 (20'') in depth and earthwork in embankment to be in 20cm(8'') layers including ramming and dressing surface to require dressing to required levels and slopes also including 1.5 meters (5fts) lifts and 30 mtr (100') the earth from cutting to be used in filling or to be deposited as spoil banks within 30 mtrs distance as directed by engineer incharge 253 providing, laying spreading and compacting stone aggregates of specific sizes to water boun
Sector: Infrastructure