Details: supply of material, labour, t&p etc.required for proper barricading along trench during and laying of pipeas per direction of engineer-in-charge (both sides of will be treated as one side for purpose of measurement. (c) cc (a) 0.0m to 1.5m b.g.l. (b) 1.5m to 3.0m b.g.l. (b) 3.0m to 4.5m b.g.l. supply of following sizes of rcc (np3) spigotted and socketed non pressure pipes( dia. in mm). (a) 3.0m to 4.5m b.g.l. (a) pcc for pipe bedding (a) b-type manhole 300 mm dia depth 2.01m to 2.3m. provide necessary fuel, labour t&p etc. required for proper running of well point equipment of required for lowering the water table during excavation and laying of sewers (well point equipment depreciation not considered)assume well point equipment will run 24 hours and 100m length of sewer will be laid per week i.e. in 5 days. (this item shall be executed when water is encountered during excavation of trenches only.) making sewer line connection etc all complete.
Sector: RDPR