Details: item description earth work excavation in (mar, kankar and kankar mixed dry soil) in digging or in embankment including lead up to 30 mtr and lift up to 1.50 mtr. including dressing making porfile and manual compaction but excluding mechaniclal compaction id or 4.12 ( 0.00 to 1.50 mtr) above gl ( machine/manual by any means) earth work excavation in (mar, kankar and kankar mixed dry soil) in digging or in embankment including lead up to 30 mtr and lift up to 1.50 mtr. including dressing making porfile and manual compaction but excluding mechaniclal compaction id or 4.12 ( 1.50 beyond 3.00 mtr) above gl( machine/manual by any means) earth work in excavation in saturated soil (excluding cost of dewatering) mar kabar and rankar soil in foundation of wall, pier, abutment etc. with disposal with in 30 mtr lead and 1.50 mtr lift. id sor 4.16 (0.00 mtr to 1.5 mtr) (machine/manual ny any means) removal of slush (excluding cost of dewatering) from the bed of nala / ponds sor 4.17
Sector: Irrigation