Details: excavation in foundation in soil (loam,clay and sand) including lift upto 1.50m and lead 30m & including filling,watering and ramming of excavated earth into the trenches into the space between the building and the sides of foundation tenches or into the plinth and removal and disposal of surplus earth as per si no.251 providing and laying in cement concrete 1:4:8 (1 cement :4 fine sand : 8 graded stone aggregate 40 mm nominal size) including supply of all materials,labour and t&p et.required for proper completion of the work and curring complete,also including cost of form work in foundation and floors as per si no.275. rcc work with cement,approved coarse sand and 20 mm gauge approved stone ballast in the proportion of 1:1½:3 in rcc slab excluding the supply of reinforcement and its bending but including its bending,supply of all other materials,labour and t & p as per si no.284(b) mild steel or iron in plain work s
Sector: RDPR