Details: earth work cutting/ filling in ordinary soil excavation to be in the form regular pits note excluding 0.5m in depth and earth work embankment to be in 20 cm layers including ramming and dressing the surface to required slows and also including 1.5m, lift and 30 m lead in all complete. site up to 10 km distance. (as per analysis of rate) construction of granular sub-base by providing well graded material, spreading in uniform layers wth motor grader on prepared surface, mixing by mix in place method with rotavator at omc, and compacting with smooth wheelo roller to achieve the desired density. complete as per technical spercification clause-401 (as per analysis of rate) rcc work providing and laying in position specified grade of reinforced cement concrete in raft foundation, including the cost of centering, shuttering, finishing and excluding reinforcement - all work up to plinth level in :1:1.5:3 (1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size) (pwd sor
Sector: RDPR