Details: blast well e/w in mar, kabar and mixed kankar soil with 1.5 m lift and 30 m lead 0.00 to 1.50 m excavation of hard clay with kankar or soft rock without blasting 1.50 to 2.70 m blasting of hard rock for deepening of well in 6 m dia 2.70 to 3.00 m 3.00 to 4.50 m 4.50 to 6.00 m 6.00 to 7.50 m 7.50 to 9.00m 9.00 to 10.50 m 10.50 to 12.00 m 12.00 to 13.50 m 13.50 to 14.00 m taking out of loose material (blasted stone) from the well after blasting 2.70 to 3.00 m 3.00 to 4.50 m 4.50 to 6.00 m 6.00 to 7.50 m 7.50 to 9.00m 9.00 to 10.50 m 10.50 to 12.00 m 12.00 to 13.50 m 13.50 to 14.00 m cement concreate work with 1:3:6 cement,sand , mortar and stone ballast 25-50mm with all charges well foundation rcr stone masonary work in 1:4 cement sand and stone khanda with all charges 2.55 to 1.50 m 1.50 to 0.00 m (upto g.l.) 0.00 to 0.40 (above g.l.) cement concreate work with 1:2:4 cement,sand , and stone grit 10-20mm size wi
Sector: Irrigation