Details: construction of granular sub-base by providing well graded material, spreading in uniform layers wth motor grader on prepared surface, mixing by mix in place method with rotavator at omc, and compacting with smooth wheelo roller to achieve the desired density. complete as per technical spercification clause-401 (as per analysis of rate) class-150 (non modular) brick work in 1:4 cement and fine sand mortar in foundation and plinth including supply of all materials, labour and tools and plants, etc. required for proper completion of the work. (fine sand not less than in 1.25 fm) (pwd sor 2022-23 chapter no-06 item no. 6.1 a spec. no. 6.1.1 a) 12 mm thick cement plaster with cement mortar in proportion of 1:4 cement & fine sand (dholpur sand not less than in 1.25 fm) of single coat for interior plastering upto floor two level including intarnal rounded angles chamfers, and rounded angles not exceeding 80mm in girth and finished even and smooth. (pwd sor 2022-23 chapter no
Sector: RDPR