Details: excavation in foundation in ordinary soil (loam clay, or sand) including lift upto 1.5 metre and lead upto 30 m & including filling, watering and ramming of excavated earth into the trenches or into the space bwtween the building and the sides of foundation trenches or into the plinth and removal and disposal of surplus earth as directed by the engineer in charge of 30 m from the foundation trenches. s.i 251 providing and laying base concrete 1:4:8 cement c/sand and 40mm gauge stone ballast including supply of all material labour t&p etc all complete s.i. 281 ist class brick work in found 1:4 cement and c/sand mortar including supply of all material labour t&p etc all complete n.s.305 n.s. earth work in embankment in ordinary soil including lift 1.50m lead 30mwith cartage of earth from 6km to site including loading unloading etc all complete mechanically . 253+231(a) 12mm cement plaster with cement mortar in proportion of 1cement & coarse sand of single coat for interi
Sector: RDPR