Description: Repair work of VRB Name of Work 0 0 3 800 0 0 0
Details: Dismentling R.C.C. slab including stacking of dismentled materials within 60.0m distance including all cost of labour etc complete. Dismentling Brick work or stone work in cement mortar and including stacking of dismenited materials within 60.0m distance. including all cost of labour etc complete. Brick work in 1:4 (1 Cement: 4 Coarse Sand) Cement Mortar including cost of all material & labour required for completion of work as directed by Engineer-in-charge. RC.C. 1:1.5:3 (1 Cement: 1.5 Coarse Sand: 3 Stone grit 20mm N/S) including all costs of T&P material required for proper completion of work as directed by Engineer-in-charge. Bending, Binding, cutting and placing of reinforcement including cost of steel, binding wire, labour and T&P etc. Complete as directed by Engineer-in-charge. Centering and shuttering for R.C.C. works/R.B. work including cost of centering and shuttering upto 3.00 M height & all labour and T&P etc. Complete as directed by Engineer-in-charge. S/F 75 mm dia P.V.C
Sector: Irrigation