Details: uprooting jhunds. earth work in silt clearance i/c lift up to 1.5 m and lead up to 30m i/c ramming and dressing by manual labour. the earth from clearance to be used in side embankment or to be disposed off at spoil banks. scrapping of internal section of existing channel i.c bed & with silt upto 5cm. cleaning thick bushes and throny jungle without uprooting.
Sector: Irrigation