Details: water bound macadam grading - 3 providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with three wheel roller 80-100kn static roller in stages to proper grade and camber, applying and brooming, stone screening to fill-up to interstices of coarse aggregate, watering and compacting to the required density grading iii as per techincal specification clause 405. including supply of all material, labour, t&p etc also including labour cess, royalty and all other applicable taxes (but excluding gst) required for proper completion of work as per direction of engineer-in-charge. providing and applying primer coat with bitumen emulsion ss-2 on prepared granular surface using bitumen pressure distributor at the rate of 0.7 kg per sqm on the prepared granular surface treated with primer & cleaned with hydraulic broom as per technical specification clause 503,including all
Sector: PWD