Details: construction of vertical stone lining in pakri left minor reach from km 0.350 to km 0.550 including all cost of material labour t&p etc. for proper completion of work as per drawing and direction of engineer-in-charge at sirsa pump canal.(gst will be paid extra as per govt. norms) e/w in excavation in foundation including back filling of excavated earth with 30m lead & 1.5 m lift etc supply and laying local sand below in foundation c.c. laying c.c. 1:3:6 in foundation & floor cr stone masonary with 1:3 c.m.for lining work. c.c 1:2:4 on d/s floor and top of crest 20 mm deep struck cement pointing on stone lining with 1:2 cm.
Sector: Irrigation