Details: earth work in cutting or in embankment in ordinary soil excavation to be the from of regular pits not exceeding ½meter (20'' ) in depth and earth work in embankment to be in 20cm (80'' ) layers,including ramming and dressing the surface to required levels and slopes and including 1.5m (5'' ) lift and 30m (100'' ) lead. the earth form cutting to be used in making embankment or to be deposited as spoil banks within 30m (100'' ) distance as directed by the e/i. as per si no. 253 (with 2 km cartage) b.o.e. soling as per s.i. no.-762 (b) providing & fixing& sighnboard etc. complete.
Sector: RDPR