Details: cc work site clearence & material shifting by labours including s/o all labour , t&p etc complete. earth work in surface excavation not exceeding 30 cm in depth but exceeding 1.5m 10sqm for drain providing & filling local sand into the trench for solid s.i no 255 providing & laying p.c.c. 1:5:10 with 40 mm. stone ballast, coarse sand & cement etc complete s.i. no.281a reinforrcement cement 1:1:5:3 1.5 corse sand drs item 5.1.2 steel reinforcement for rcc work drs item no 5.22.6 (rate 107.10*0.749) centering and shuttering including structure drs iten no. 5.9.1 centering and shuttering including structure drs iten no. 5.9.2 dispposal of excavated surplus earth iincluding cartage of earth 70 per excavated soil brick work with commom burnt clay fps 7.5 in foundation and plinth dsr item 6.1.1(rate 357.35*0.749) 12 mm cement plaster of mix 1:4 dr item no 13.4.1 p/l pcc 1:2:4 with cement coarse sand dsr item no. 4.1.3 supply & fixing of inagration stone board size 0.60*0.75 mtr gst
Sector: RDPR