Details: fxcavation in foundation in ordinary soil, loame, clay or sand linculuding lift upto 1.5 m & lead upto 30m including filling watering&ramming of excavated earth into the trenches or into the space between the building & the sides of foundation trenches or in to the plinth removal & disposal of surplus earth as directed by the engineer in charge upto a distance of 30mfrom the foundation trenches. dsr no 2.6.1 earth work in embankment in ordinary soil excavation to be in the regulour pits not exceeding 0.5 m depth and earth work in embankment to be in 20 cm layers including ramming and dressing |the surface to required levels and slops and also in inculding 1.5 m lift & 30m lead . lead extra 3km cartage including watering dressing as per dsr no 2.25a concrete with 4 cm. gauge brick ballast, final local sand of 1.25 fm and cement in proportion'of 8 :4 : 1 in foundation and under floor, |including supply of all material with mixer machine, labour and t & p etc. required for proper completi
Sector: RDPR