Details: earth work in trench cutting in proper camber according to required depth for laying garnular sub base including rolling with road roller upto required m.d.d., dressing, cost of labour, t&p and hire charges of machinery etc. complete work as per pwd specification construction of granular sub base by providing coarse graded material, mixing in a place method at o.m.c. carriage of mixed material to work site, spreading in uniform layer with motor grader on prepared surface and compacting with vibtatory power roller to achive the desired density complete as per clause 401. providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at omc in mechanical mix plant carriage of mixed material by tipper to site, laying in uniform layers with paver in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density. disposal of malwa and garbage beyond muncipa
Sector: PWD