Details: dry earth work in excavation for building / civil structure / apron including lead upto 30.00 m and lift upto 1.50 m and its disposal. laying c.c. in 1:3:6, m-10 in foundation with 20-40 mm size stone ballast & coarse sand including cost of all material, labour and t&p supply and laying of np.-3 (1200 mm) r.c.c. pipe including all cost of material labour t&p etc. laying and fixing in position and alignment excluding excavation back filling and cost of material. hume pipe 900 mm np-3 laying and fixing in position and alignment excluding excavation back filling and cost of material. hume pipe 1000 mm np-3 first class brick work in 1:4 cement and fine sand of 1.25 f.m. mortar in foundation and plinth including supply of all materials labour and t and p etc. required for proper completion of the work . dry earth filling including ,manual compaction dressing lead upto 30.00 m and lift upto 1.50 m in building and masonary works . earth work in filling by power transport for a lead of u
Sector: Irrigation