Details: exavation in foundation soil(laom clay or sand) including 1.5 m. lift and 30 m. lead & including filing watering and ramming of excaveted earth in to the trencheses or in to the space between the building and the sides of foundation trenches or into the plinth and removal and disposal of surplus earth as directed engineer in charge up to distance of 30 m. from foundation trenches. provoding and laying in cement concrete 1:6:12 (1 cement : 6 fine sand : 12 graded brick aggregate 40mm. nominal size) and curring complete including cost of form work in foundation and floors. under wall brickwork with common burnt clay f.ps.(non modular) bricks of class designation 7.5 in foundation and plinth in: cement mortar 1:4 (1cement : 4 coarse sand) rcc work with cement approved c/sand &20mm approved stone blastin the proportion 1:1.5:3 with all comp.raft mild steel or iron in plane worksuch as reinforcement brick work (when not wrought to include in over all rate) with all comp centering
Sector: Urban Authority