Details: pathway scarifying metalled (water-bound) road surface including disposal of , lead upto 50 m and consolidation of the aggregate received from scarifying with power road roller of 8 to 10 tonne capacity. demolishing brick work manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of engineer-in-charge. in cement mortar demolishing r.c.c. work manually/ by mechanical means including stacking of steel bars and disposal of unserviceable material within 50 metres lead as per direction of engineer - in- charge. demolishing cement concrete manually/ by mechanical meansincluding disposal of material within 50 metres lead as per direction of engineer - in - charge.nominal concrete 1:3:6 or richer mix (i/c equivalent design mix) taking out existing cc interlocking paver blocks from footpath/ central verge, including removal of etc., disposal of unserviceable material to the dumping ground, for w
Sector: RDPR