Details: carriage of pcc pole from store center kunera etawah to site of work through the kacha and pakka road including the work of its loading and unloading at the respective ends including the cost of arrangement of labour, t&p, carrier etc. required for proper completion of work. st 11 mtr. long/pcc 8.5 mtr. long pole line material i.e. conductor, g.i. wire tpmo stay rod, disc insulator, cross arm, angle channel, different type of clamps and other required material acsr weasel conductor 11 kv xlpe cable 3x185 sqmm 25 kva distribution transformer 63 kva distribution transformer 100 kva distribution transformer grouting, concreting and plinting of single support on pcc pole 8.5 mtr. long with cement, coarse sand & stone ballast duly grouted including necessories clamps, accessories required fixing of ht/lt fittings as per resspo norms. the support shall be grouted in cement, sand and brick ballast. it including the cost of all labour, t&p etc. required for proper completion of work. gr
Sector: Distribution