Details: earth work in silt clearance including lift up to 1.5 m and lead up to 30 m by manual labour or machines. the earth from clearance to be used in side embankment or to be disposed off spoil banks or as directed by engineer-in-charge. drains uprooting jhunds and moonj wih disposal away from site. earth work in foundation in dry ordinary soil including lift up to 1.5 meter and lead up to 30 meter and including back filling, watering and ramming as directed by the engineer-in-charge . . cement concrete 1:3:6 in foundation with cement, coarse sand , and stone grit 20-40 mm size including cost of all materials, labour , dewatering and t&p complete etc . ist class brick work in 1:4 c.m. cement and coarse sand including cost of all materials, labour and t& p etc cement pointing (struck deep) on brick masonry with cement mortar 1:2 including cost of all materials, labour and t& p etc c.c in 1:1.5:3 with cement, coarse sand , and stone grit 10-20 mm. including cost of all materials lab
Sector: Irrigation