Details: earth work in silt clearance including lift up to 1.5 m and lead up to 30 m by manual labour or machines. the earth from clearance to be used in side embankment or to be disposed off spoil banks or as directed by engineer-in-charge. (a) drains (with out compaction and light dressing. uprooting jhund and moonj with disposal away from site. ist class brick work in 1:4 c.m. cement and coarse sand including cost of all materials, labour and t& p etc cement pointing (struck deep) on brick masonry with cement mortar 1:2 including cost of all materials, labour and t& p etc cement plaster on brick masonry with cement mortar 1:4 including cost of all materials, labour and t& p etc c.c in 1:1.5:3 with cement, coarse sand , and stone grit 10-20 mm. including cost of all materials labour t&p complete etc . wall painting (two coat) with plastic emulsion paint of approved brand and manufacture on decorative wall surface to give an even shade including thoroughly brushing the surface clean
Sector: Irrigation