Details: removal of slush from nala bed before excavation s.soil earth work excavation in ordinary kanker mixed hard soil i/c 1.50 m lift and 30 m.lead. earth work excavation in ordinary kanker mixed hard soil i/c 1.50 -3.0 mtr. lift and 30 m.lead. dismantling existing plaster and pointing including disposal of refuse as directed by engineer-in- charge within a distance of 60 m. dismantling plain cement concrete including base dismantling brick work, stone work in lime or cement mortar includingstacking of materials as directed by engineer in-charge within a distanceof 60 m. p.c.c. work in 1:3:6 cement sand & 20-40 mm stone-ballast i/c cost of materials labour etc. as per required. r.c.r. stone masonary work in 1:4 cement sand morter i/c the cast of material labour etc. required.for proper complition of the work . c.c.work 1:2:4 cement, sand, 9- 20 mm stone granite grite i/c cast of materials labour etc.as per required plaster work 1:3 cement sand mortar on stone masonary i/c cast of mater
Sector: Irrigation