Details: dewatring charges during the work by 5 h.p. earth work excavation in ordinary kanker mixed hard soil i/c 1.50 m lift and 30 m.lead. earth work excavation in ordinary kanker mixed hard soil i/c 1.50m to 3.00 lift and 30 m.lead. dismantling existing plaster and pointing including disposal of refuse as directed by engineer-in- charge within a distance of 60 m. dismantling plain cement concrete including base c.c.work 1:2:4 cement, sand, 9- 20 mm stone granite grite i/c cast of materials labour etc.as per required plaster work 1:3 cement sand mortar on stone masonary i/c cast of material, labour etc.required proper completion of work. raised pointing work 1:2 cement sand mortar on stone masonary i/c cast of material labour etc. required as per proper completion of work. strenthning of bank in u/s of reservoir both bank of nala up to 0-1.50 m lift strenthning of bank in u/s of reservoir both bank of nala up to 1.5-3.00 m lift
Sector: Irrigation