Details: cleaning of site such as garbage and silt /photography providing and laying 1:2:4 ( 1 ement : 2 c/s : 4 graded stone aggregate 20 mm nomonal size ) in position specified grade of reinforced cement concrete, including the cost of centering, shuttering, finishing and excluding reinforcement - all work up to plinth level : mild steel or iron work in plain work such as reinforced concrete or reinforced brick work (when not included in and an over all rates) brought to required shape as necessary including bending for proper completion of the work and excluding the supply of steel and its wastage bend, hooks and authorized over lapping shall be measured upto floor to level. add 18% gst the total value of schedule4
Sector: RDPR