Details: a. earth work in excavation in hard soil on bank of nala including 2 lead a. earth work in excavation up to bed of nala with 2 lead and 5 lift above 1.50 m for every 030m. lift or part there of removal of slush from bed of nala and wing wall with 2 lead and 1 lift up to ground height for every 0.30 m .lift or part there of earth work in excavation in wet soil in foundation of crest, wing wall, cut of wall apron,and floor in up and down stream with 2 lead and 10 lift of up to ground height for every 0.30 m. lift or part there of plain cement concrete in 1:3:6 cement course sand and 40mm stone ballast in foundation of wing wall crest floors cut off wall etc. including supply of material and labour t&p etc.required for proper completion of the work rendum rubble/ khanda masonary with 1:4 cement course sand mortar up to bed level with 20x20x20 size khanda in wing walls ,crest wall , protection walls including supply of all material ,labour and t&p required for proper co
Sector: Irrigation