Details: earth work in excavation in (mar, ranker and kankar mixed dry soil) in digging or in embankment including lead up to 30 m and lift upto 1.5m including dressing making profile and manual compaction but excluding mechanical compation. id sor 4.12 (0.00 to 1.5 mtr.) above g.l. ( machine /mannual by any means) ) earth work in excavation in (mar, ranker and kankar mixed dry soil) in digging or in embankment including lead up to 30 m and lift upto 1.5m including dressing making profile and manual compaction but excluding mechanical compation. id sor 4.12 (from 1.5 mtr. to beyond 3.0 mtr.) ( machine /mannual by any means) ) earth work in excavation in saturated soil (excluding cost of dewatering) mar kabar and rankar soil in foundation of wall, pier, abutment etc with disposal with in 30 mtr lead and 1.50 mtr lift. id sor 4.16 (0.00 mtr. to 1.5mtr.) ( machine /mannual by any means ) earth work in excavation in saturated soil (excluding cost of dewatering) mar kabar and rankar soil in foun
Sector: Irrigation