Description: CC road ka karya Name of Work 39 0 0
Details: Earth work in cutting / filling and cartage up to 8 km away from site etc all complete. Excavation for earth for the foundation for the brick work etc all complete. Plain cement concrement 1:4:8 nominal mix in foundation with Stone ballast 40 mm nominal size etc all complete. Brick masnory work in 1:4 cement mortar in foundation complete excluding pointing and plastering as per drawing and technical specification etc all complete. Construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth MORD specifications 401 S/L of 125micron polythene sheet under the foundation (for anty salt peter treatment) or over subbase to act as separation between subbase & concret slab.( for CC road slab) i/c supply of all materials, labour T&P required for proper completion of the work. Laying CC road slab consisting of 1:1.5:3 cement, coarse sand & a
Sector: Urban Authority