Details: excavation of filling in foundation in ordinary soil including lift upto 1.5 mtr. and lead upto 30 mtr. including filling watering and ramming of excavated earth into the trenches of into the space between the building and the sides of foundation, trenches or into the plinth and removal & disposal of surplus earth as directed by the engineer incharge as per si. no. 251 cement concrete with 40mm gauge stone ballast fine sand of 1.25 fm and cement in proportion of 1:4:8 in foundation and under floors including supply of all materials ,labour , t&p, etc. required for proper completion of work as per si. no. 281 rcc work with cement approved course sand and 2 cm gauge approved stone grit in propottions of 1:1.5:3 in slab excluding supply of reinforcement and its bending but including its fixing and bending but including its fixing and binding the same with 24 bwg gi binding wire and including necessary centering and shuttering etc and supply of all material labour t&p etc required for pro
Sector: RDPR